GKL GROUP | Construction Professionals
  • Home
  • About Us
  • Construction Services
    • Construction Management
    • Consultation
    • Project Management
    • Business Development Services
    • Defence Industry Support
  • Industry Sectors
    • Ports and Marine
    • Roads and Civil
    • Structures and Bridges
    • Commercial Assistance
    • Water and Wastewater
    • Defence
    • Rail
  • Experience
    • Port of Townsville
    • Peak Downs Highway
    • Road Asset Management Contract
    • Horseshoe Bay Road
    • Pre-Qualification Assistance
    • Riverway Boardwalk
    • Construction Industry Support
    • Sea Wall Project
    • Design Management
    • ETS Geo Consultation
    • Collinsville - Elphinstone Road Bridge
    • Operations Management Manual
    • Gregory Developmental Road
    • Bruce Highway Safety Updates
    • Allambie Lane Upgrade
    • Suttor Developmental Road Rail Crossing
    • The Strand Jetty
    • Cairns Water Security Upgrade
    • Castle Hill Reservoir Tank Replacement
    • Ingham Road Watermain Upgrade
  • News
  • Contact Us
  • Home
  • About Us
  • Construction Services
    • Construction Management
    • Consultation
    • Project Management
    • Business Development Services
    • Defence Industry Support
  • Industry Sectors
    • Ports and Marine
    • Roads and Civil
    • Structures and Bridges
    • Commercial Assistance
    • Water and Wastewater
    • Defence
    • Rail
  • Experience
    • Port of Townsville
    • Peak Downs Highway
    • Road Asset Management Contract
    • Horseshoe Bay Road
    • Pre-Qualification Assistance
    • Riverway Boardwalk
    • Construction Industry Support
    • Sea Wall Project
    • Design Management
    • ETS Geo Consultation
    • Collinsville - Elphinstone Road Bridge
    • Operations Management Manual
    • Gregory Developmental Road
    • Bruce Highway Safety Updates
    • Allambie Lane Upgrade
    • Suttor Developmental Road Rail Crossing
    • The Strand Jetty
    • Cairns Water Security Upgrade
    • Castle Hill Reservoir Tank Replacement
    • Ingham Road Watermain Upgrade
  • News
  • Contact Us

East Port Development

26/5/2026

 
East Port Development
GKL Group has successfully completed Project Management services for Port of Townsville Limited on the East Port Development, encompassing the Benwell Road Intersection, East Port Connection Road and Windfarm Laydown Area projects.

​The engagement spanned 2.5 years and covered the full project lifecycle, from early-stage design development and cost estimation through to construction supervision and final delivery. It is the kind of end-to-end project management work that GKL Group is well positioned to deliver, bringing both technical capability and practical experience to a project that presented its share of genuine challenges.

Design development was undertaken in close consultation with the Port, key stakeholders and future potential Port customers. The goal was straightforward: ensure the road and laydown infrastructure was fit for purpose and capable of handling the real-world demands of the end users, including long-load transport and heavy point load machinery associated with cargo handling at the Port. That consultative approach set the tone for how the project was managed throughout. Open communication between the GKL Group team and the Port of Townsville meant that when challenges arose, they were worked through constructively rather than allowed to compound.

The construction works included lightly bound and unbound granular pavements, asphalt and seal works, earthworks, services installation and relocation, drainage works and fencing. One of the more significant technical challenges involved the ground conditions across the site, with existing dredge ponds and silty soils presenting real complexity for pavement design and construction. Close collaboration between the project team and designers was required to develop a pavement solution capable of meeting the heavy point load requirements of the end users.

The East Port Development was delivered on time and under budget. For GKL Group Managing Director Glen Langfeldt, that outcome is a reflection of what is possible when the right working relationship is in place.

"Projects like this one don't deliver well by accident," said Glen.
​
"The Port of Townsville team were genuinely collaborative throughout,” he commented.

“When issues came up, and they always do on a project of this scale and complexity, we worked through them together. That kind of open communication makes a real difference to the end result," said Glen.

Glen also pointed to the broader significance of the project for the region.

"The Port of Townsville is critical infrastructure for North Queensland. Being part of a project that supports its ongoing growth, and operational capability is something the whole GKL Group team can feel good about," he added.

The sentiment was echoed by Port of Townsville Limited's Manager Project Management Office, Michael O'Reilly, who acknowledged the GKL Group team directly on project completion.

“After a challenging few years as the Project Manager, I’m proud to see this project delivered on time and under budget.  None of this would have been possible without the dedication and support of the team at GKL Group and the wider Port of Townsville Project Delivery Team,” said Michael.
​
GKL Group thanks Port of Townsville Limited for the opportunity to be part of the East Port Development and looks forward to continuing the collaboration on future projects.

Comments are closed.

    Archives

    May 2026
    April 2026
    March 2026
    January 2026
    December 2025
    October 2025
    September 2025
    August 2025
    July 2025
    June 2025
    May 2025
    April 2025
    March 2025
    February 2025
    January 2025
    December 2024
    November 2024
    September 2024
    August 2024
    July 2024
    April 2024
    February 2024
    December 2023
    November 2023
    October 2023
    September 2023
    August 2023
    July 2023
    June 2023
    May 2023
    April 2023
    March 2023
    February 2023
    January 2023
    December 2022
    November 2022
    October 2022
    September 2022
    December 2021
    June 2021
    May 2021
    April 2021
    March 2021
    February 2021
    January 2021
    December 2020
    November 2020
    October 2020
    August 2020


    Categories

    All
    Announcements
    Australian Partners Of Defence
    Bid Management
    Business Development Services
    Careers
    Central Queensland
    Collaboration
    Community
    Construction Management
    Consultation
    Defence Industry Support
    Employment
    Energy
    Far North Queensland
    GKL Group At Work
    Inspection Services
    North Coast
    North Queensland
    Principal's Representative
    Project Management
    Quality
    Queensland
    Safety
    SEQ
    Team
    Western Queensland
    Works Packages


    Author

    GKL Group

GKL Group constructions services

GKL Group

​Construction Management
Consultation
Project Management
Business Development Services
Defence Industry Support
​About Us
News 
Contact Us
Tel 0407 863 530
Email [email protected]
260 Queens Street Brisbane Qld 4000
​5 Woolcock Street Hyde Park Qld 4812
​Postal Address PO Box 2286 Idalia Qld 4811
​ABN 12 647 828 591
©GKL Group. All rights reserved. Website by Roxanne Grey Consulting.
ISO Quality Assurance GKL Group Queensland